Square footage and finish level
Polished concrete and site-finished millwork are not the same job as painted drywall and vinyl plank, at the same square footage.
Post-construction cleaning scope in Austin
Insured · Written cleaning scope · One point of contact · 5.0 stars from 12 Google reviews · Austin, TX
A plain answer to what is actually in the scope — surface by surface — and, just as usefully, the three places the line gets drawn: where debris removal stops, where residue ends and damage begins, and who takes the protective film off. Free quote on the phase your jobsite needs.
A post-construction clean covers the removal of construction dust and residue from every surface in the finished space — floors, glass, fixtures, cabinet interiors, vents, tracks and trim — plus protective film and label removal. It does not cover bulk debris haul-off, trade repairs, or damage already in a finished surface.
“Everything gets cleaned” is not a scope, and it is why handovers get argued about. Construction dust settles into places a normal clean never goes, so what separates a real final clean from an expensive wipe-down is whether the crew works the surfaces below rather than the ones at eye level.
| Surface group | What a final clean covers | Where the dust actually survives |
|---|---|---|
| Floors | Vacuumed, then a damp pass appropriate to the finish; edges, corners and thresholds worked by hand | Grout lines, expansion joints and the perimeter bead a machine cannot reach |
| Glass and frames | Both faces, frames, tracks, sills and weep holes; overspray assessed before it is bladed | Tracks and weep holes — the first thing a picky walkthrough opens |
| Cabinetry and millwork | Drawer and cabinet interiors, shelf pins, toe kicks, tops of upper cabinets | Inside drawer boxes and the flat top of the uppers, unseen until move-in day |
| Fixtures and mechanical | Light fixtures and lenses, fan blades, vent registers and diffuser faces, switch plates, thermostat | Register vanes and fixture cups, which blow dust back into a room you just cleaned |
| Doors, trim and high surfaces | Door tops and hinge knuckles, trim reveals, ledges and the header above door frames | The tops of doors — invisible until the door is opened in raked afternoon light |
Two jobsites of identical size are not the same clean, and the reason is what got installed. Post-construction is also the single riskiest moment in a finish’s life: coatings may still be curing, sealers may not be down yet, and residues that were never meant to sit on a surface have been sitting on it for weeks. That combination means the expensive failure in this trade is not a surface left dirty. It is a surface permanently marked by the wrong product, which turns a cleaning invoice into a replacement invoice.
Every commercial job already has the answer in its submittal package — the finish schedule and the manufacturers’ care sheets. Almost nobody hands them to the cleaning crew. Asking for them before the quote is the cheapest thing anyone on a jobsite can do.
| Finish | Why the final clean is the risky moment | What the scope has to respect |
|---|---|---|
| Site-finished hardwood | The coating can be dry to the touch long before it has cured, and a final clean usually lands inside that gap. | Dry methods until the finisher confirms the cure. Water on a green finish can cloud it, and the mark is inside the coating rather than on it. |
| Polished concrete | The shine is mechanical polish and a densifier, not a coating, so there is nothing sacrificial on top of it. | Neutral pH only. Acidic products etch the surface and dull the reflectivity, and the remedy is a re-polish by the concrete trade rather than another clean. |
| Unsealed or honed stone | Limestone, travertine and marble are frequently installed before sealer goes down, so they are at their most absorbent exactly when the most is being spilled on them. | Nothing acidic, and grout haze gets removed by the tile trade’s method before it cures. Once it has cured, it is stone restoration work and not a cleaning line item. |
| Matte and flat wall paint | The most-argued surface on any handover walk. Flat paint has almost no binder film protecting the pigment. | It cannot be wiped. Rubbing burnishes a shiny patch that is more visible than the mark was. Marks on flat paint are a painter’s touch-up, and the scope should say so. |
| Anodized and powder-coated aluminum | Storefront and window frames collect mortar splash, grout slurry and stucco residue, all alkaline, and it sits there for weeks. | Removal has to be early and mild. Strong alkaline cleaners attack anodizing and leave a stain that does not come back out, which makes a residue into a frame replacement. |
| Tempered and coated glass | Fabricating debris fused into tempered glass, plus low-E coatings and applied films, mean the outer surface is often not what it looks like. | Assessed before anything is bladed. Blading coated, filmed or already-scratched glass is permanent, and on a storefront the remedy is a glazing invoice. |
| Stainless steel | Protective film, fingerprints and construction dust arrive together, and the instinct is to scrub. | Worked with the grain, never across it. A cross-grain swirl is mechanical damage and no polish takes it back out. |
| Quartz and natural-stone counters | They look alike on a walkthrough and tolerate opposite things. | Confirm which is actually installed before choosing a product. Quartz shrugs off staining but is damaged by heat and strong solvent; marble stains and etches from anything acidic, including some general-purpose cleaners. |
| Factory-finished LVT and engineered wood | A no-wax surface that a well-meaning crew tries to make shine. | No wax, no polish and no aggressive pad unless the manufacturer’s own sheet calls for it. A polish put down on a no-wax floor has to be stripped back off, at somebody’s cost. |
None of this is exotic. It is the reason a real scope asks what is installed before it quotes, and the reason “we clean everything” is a warning rather than a service level.
Almost every dispute about a post-construction clean is one of the same three questions, and all three are cheaper to settle in the scope than on the handover walk.
Offcuts, packaging, pallets and drywall scrap belong to the trades that produced them and go in the job’s dumpster. A cleaning crew removes dust and residue and bags what the clean itself generates. The practical trap is scheduling: dumpsters leave as soon as the trades finish, which is exactly when the final clean starts. If the container is gone, someone is making a dump run that nobody priced.
Residue sits on a surface and releases with the right chemistry, dwell and technique. Damage is in the surface, and no amount of cleaning brings it back. Overspray on sound, uncoated glass comes off with lubrication and a blade at the right angle — but on glass already scratched, or carrying a low-E or applied film, blading makes it permanently worse, which is why that glass gets assessed rather than attacked. The same line runs through joint compound driven into open-grain wood, cured grout haze, and grit dragged across a floor before protection went down. Our commercial window cleaning page covers the same distinction on glass, where mineral deposit responds to treatment and etching never does.
Damage we find is photographed and reported while the job is still open and the responsible trade is still reachable — worth more than a crew quietly scrubbing at something it cannot fix.
Window film, appliance film, floor protection, tape lines and manufacturer labels all have to come off, and stripping them is real labor rather than an afterthought. It also has a clock on it: film left in Texas sun past its intended life bakes its adhesive onto the substrate, and what should have been a peel becomes a solvent job that behaves differently on glass, stainless and a painted frame. If protection has been down through a summer, say so before the quote.
The three boundaries above are the ones that get argued about. There is a fourth that quietly costs more than all of them, and it is almost never in the scope: the jobsite is not finished when the final clean is finished. Punch items get worked. A door gets rehung, a leak gets chased, a light gets swapped, a cabinet gets adjusted. Each of those returns puts dust back into a room that was genuinely clean when the crew left it.
Then comes the awkward conversation, and it is awkward because both parties are right. The clean was done properly. The room is dusty. Nobody priced the gap.
There are three structures that work, and the only real mistake is silence:
What does not work is leaving it out and settling it in the corridor on handover day, when the person who has to pay for it is standing next to the person who has to explain it.
One more thing gets blamed on a cleaning crew that no cleaning scope can fix. If the air handling ran during construction without filter protection, the ductwork is now holding drywall dust, and that dust keeps re-depositing for weeks onto surfaces that were genuinely clean at handover. It looks exactly like a bad final clean, and it is not one.
Duct interiors are a separate licensed trade and remain outside every scope on this page. What does belong in the scope is narrower, and stating it costs nothing: filters get changed before the final clean rather than after it, and register faces, diffuser vanes and grille frames are cleaning’s job while everything behind them is not. A room cleaned under a register that is still loaded is a room that will need doing twice.
The work splits into a rough clean once heavy work wraps, a final detail clean before handover, and an optional touch-up after furniture and the last trades clear. Which of those a job needs — and how to schedule them backwards from the handover date around live trades — is covered on post-construction cleaning in Austin, and pricing on post-construction cleaning cost. General contractors and developers booking construction site cleaning in Austin can book any one of the three phases, or all three.
One thing belongs here though, because it changes the price rather than the scope: a final clean run while trades are still cutting is not a final clean. It is a rough clean at a final clean’s price, and the space needs doing again. Sequencing matters more than crew size.
Publishing the boundary is more useful than a longer list of inclusions. Not included: bulk debris haul-off; trade repairs and punch-list work; lead or asbestos abatement, a licensed trade a cleaning crew should never improvise; HVAC duct cleaning; exterior site and landscape debris; and exterior glass above ladder height.
Bailey & Bear provides post-construction cleaning in Austin with a written scope and one point of contact. Each phase has a documented boundary and handoff standard.
Polished concrete and site-finished millwork are not the same job as painted drywall and vinyl plank, at the same square footage.
The single biggest driver of whether a final clean holds. One trade still cutting re-dusts a finished room in an afternoon.
Decides where bagged debris goes and whether a dump run needs pricing into the job at all.
Keys, hours, freight and dock windows, and whether water and power are live — together these decide which days exist.
Everything schedules backwards from it, including whether a touch-up pass is worth booking at all.
Those two phrases, plus “final clean,” carry most of the weight in post-construction contracts, and not one of them is defined by any standards body. Each means whatever the two parties assumed, and the parties assumed different things, which is why the argument always happens at the end rather than the beginning. A scope that names the phrase and stops has not specified anything. A scope that names the surfaces — the list further up this page is a working version — has.
Two more terms are missing from almost every scope we are asked to quote against, and they decide more walkthroughs than the surface list does.
A finished space passes at two in the afternoon with daylight flooding the room, and fails the same evening under LED downlights washing down a wall. Nothing changed except the angle of the light. Raking light across a surface at a low angle reveals every streak on glass, every dust line on a door top, every bit of roller stipple in paint — and it is the light almost every commercial space actually gets used under.
So the two parties look at the same room, in good faith, and honestly disagree. The fix costs nothing: say when the acceptance walk happens and under what lighting, or walk it twice and settle both. Our crews would rather be judged under the harder light and know it in advance than pass at noon and get called back at eight.
Post-construction is the only clean routinely accepted by somebody who did not order it. The general contractor books it and pays for it; the owner, the tenant or the architect is the one walking the space and deciding whether it is finished. That means the crew is being measured against a standard it never negotiated, by a person it may never have met.
Naming that person, and the moment, is worth more than another paragraph of inclusions. Three lines turn “clean” into something that can be tested and signed:
Bailey & Bear provides post-construction cleaning in Austin with a written scope and one point of contact. Each phase has a documented boundary and handoff standard.
Everything construction left ON a finished surface — dust, overspray, adhesive, grout haze, protective film, tape and labels — worked surface by surface rather than at eye level. What it does not include is anything construction left AS the surface, meaning damage, or the bulk debris the trades generated.
Bulk debris is not. Offcuts, packaging, pallets and drywall scrap belong to the trades that made them and go in the job's dumpster; we remove dust and residue and bag what the clean itself produces. If the dumpster has already left, that bagged debris has nowhere to go.
Yes, and it belongs in the scope because it is real labor. Window and appliance film, floor protection, tape lines and manufacturer labels all come off. Film left in Texas sun past its intended life bakes its adhesive on, turning a peel into a solvent job.
Usually, if the glass is sound. Overspray on intact, uncoated glass comes off with lubrication and a blade at the right angle. On scratched glass, or glass carrying a low-E or applied film, blading makes it worse — so it gets assessed first.
Then cleaning will not fix it, and we say so instead of scrubbing at it. Etched glass, compound driven into open-grain wood and grit scratches in a floor are damage in the surface. We photograph and report them while the responsible trade is still reachable.
No. A punch-out remodel often needs only a final clean, while a full build usually benefits from all three. Which phases a job needs, and how to schedule them backwards from the handover date, is covered on our post-construction cleaning page.
Live water and power, keys plus any building rules on freight and hours, a dumpster or an agreed place for bagged debris, and a clear answer on which trades are still working. If anyone is still cutting, book a rough clean now and schedule the final one after they are out.
Regular cleaning maintains a space already in use. A post-construction clean removes construction-specific residue — drywall dust, overspray, adhesive, grout haze — from a space nobody has occupied yet, as a one-time or phased job rather than a recurring schedule.
Bulk debris haul-off, trade repairs and punch-list work, lead or asbestos abatement (licensed trades), HVAC duct cleaning, exterior site debris, and height-access exterior glass. We also will not promise a handover sign-off that depends on work we did not do.
General contractors and remodelers needing a clean handoff, property managers and owners preparing a space for occupancy, and venue or restaurant teams closing out a build-out.
Legally, nothing fixed — neither term is defined by any standards body, so each one means whatever the two parties assumed, and they usually assumed differently. That is why the disagreement lands on handover day. A scope that names the phrase has not specified anything; a scope that names the surfaces, says who walks the space and when, and states the lighting the walk happens under has.
Usually not, and a crew that says otherwise is about to make it worse. Flat and matte paint has almost no binder film protecting the pigment, so rubbing a mark burnishes a shiny patch that is more visible than the mark was. Marks on flat paint are a painter's touch-up rather than a cleaning item, and we report them instead of working at them.
Whoever agreed to in advance — which is the whole point. Punch work re-dusts a room that was genuinely clean when the crew left, so the cost exists on nearly every job. Three structures work: a touch-up clean priced as its own line in the original quote, an hourly re-clean rate with a written not-to-exceed, or scheduling the final clean after punch and accepting that handover moves. Leaving it unstated is the expensive option.
Bailey & Bear provides post-construction cleaning in Austin with a written scope and one point of contact. Each phase has a documented boundary and handoff standard.
Tell us the square footage, phase, and timeline — we return a clear, itemized price.
Tell us about the jobsite and timing. Fields marked are required.