Post-construction cleaning checklist for Austin job sites
A post-construction cleaning checklist splits the work into three phases: the rough clean while trades are on site, the final clean before inspection and turnover, and the touch-up clean before the owner or tenant walk-through. Below is the checklist our crew works from in Austin. Print this page from your browser and walk it with your superintendent.
Request a quote for your checklistCall 512.689.8346Text us
Since 2017 · Written quote within 24 hours · Call or text 512-689-8346
What should a post-construction cleaning checklist include?
Every phase, every room type and every surface the next person will touch or see: debris, dust on high and low surfaces, glass, fixtures, cabinets, restrooms, kitchens and break rooms, and floors. The phases themselves are explained on our rough, final and touch-up construction cleaning page.
What is on the rough clean checklist?
- Loose debris, scraps and packaging gathered to the on-site dumpster
- Floors swept and drywall dust vacuumed
- Window frames, sills and ledges wiped
- Stickers and loose labels pulled where trades are finished
- Restrooms and break areas cleared of trade debris
- Work areas left clear for the next trade
What is on the final clean checklist?
- Light fixtures, ledges and high surfaces dusted
- Doors, frames, hardware and switch plates wiped
- Cabinets, drawers and shelving cleaned inside and out
- Interior glass, mirrors and window tracks cleaned; paint spatter and labels removed from glass
- Restroom fixtures, partitions and counters cleaned
- Kitchen and break-room counters, sinks and appliance exteriors cleaned
- Baseboards wiped
- Floors swept, vacuumed and mopped
What is on the touch-up checklist before turnover?
- Re-dust surfaces where dust has settled since the final clean
- Fingerprints and smudges off glass, doors and fixtures
- Floors redone where punch-list trades worked
- Restrooms checked and restocked if supplies are on site
- Last walk-through of each room against this list
What should a superintendent check before signing off?
Walk each room with this list in hand: look along glass and ledges in daylight, open cabinets and drawers, check corners and baseboards, and run a hand along door frames. Mark anything inside the agreed scope, and the crew picks it up during the touch-up pass. The longer explanation is on what post-construction cleaning includes.
How do I get this checklist priced for my building?
The owner does every quote walk-through and turns this checklist into a written scope for your building, with the written quote back within 24 hours. Our crew can clean over 70,000 square feet in a single night. We carry general liability insurance, with a certificate of insurance (COI) on request. Start at get a commercial cleaning quote, see post-construction cleaning in Austin, or call or text 512-689-8346.
Frequently asked questions
Can I use this checklist with my own crew?
Yes. It is written for superintendents and site teams, and you are welcome to print it and use it on your job.
Is the touch-up clean always needed?
Not always. If no trades return after the final clean, the touch-up pass can be skipped; we confirm that with the site contact.
Do you disinfect restrooms on a final clean?
Yes, with EPA-registered disinfectants, and green products on request.
How long have you been cleaning in Austin?
Bailey & Bear Cleaning has cleaned commercial spaces in Austin since 2017.
Request a quote for your checklist
Send the building, the phase and the target dates. The owner walks the site, and the written quote follows within 24 hours.